Washington Companies Maintenance

Maintenance Contracts: Invitation to Bid

  • Open RFP Categories
    • 2026 North Centre II – Asphalt Maintenance Project
    • 2026 NP Depot – Asphalt Maintenance Project
  • Expectations
  • Contact Us

2026 North Centre II – Asphalt Maintenance Project

PROPOSAL DUE DATE March 2, 2026
AWARD DATE: March 20, 2026
CONTRACT PERIOD: May 1, 2026 - September 30, 2026

North Centre II Asphalt Maintenance Project

Locations of Work (1):
Northcentre II
2800 North Reserve Street, Missoula, MT 59808

Downloadable Documents:
RFP - NC2
SOW - NC2
Exhibit A - NC2

Gateway Limited Partnership (“Owner” or “GLP“) is requesting proposals for 1) the mill and overlay of the other half of its front parking lot and 2) striping of all its parking lots.

Contractors (“Contractor”, “Company”, “your” or “you”) are hereby invited to submit a statement of qualification and a proposal to provide these services in accordance with this request for proposal (“RFP“).

1. RFP SCHEDULE

Issue Date January 30, 2026
Pre-proposal Site Visit February 10, 2026
Proposal Submissions Due March 2, 2026 at Midnight
Notification of Award March 20, 2026

Proposals will not be evaluated unless all documents requested are submitted in a complete package. The information requested is the minimum required in order to qualify for consideration.  Your statement of qualification should include company history, company principals, safety program and appropriate licenses. The selected contractor will be required to enter into an agreement based on the specifications outlined in this RFP.

The property is managed by Washington Corporations’ Facilities Department.

2. SCOPE OF WORK

2.1  See the scope of work (“SOW”) for details.

The SOW includes the following documents:

        1. SOW (3 pages)
        2. Exhibit A – Drawing (1 page)

2.2  Any modifications to the SOW shall require a formal change order which must be mutually agreed upon in writing and executed by both parties.

3. CONTACTS

Questions will not be accepted by telephone.  All questions must include contractors name, address and/or email address and be submitted 72 hours prior to proposal due date.

Any questions concerning this RFP and all correspondence must be submitted in writing by contacting:

Brian Brush ([email protected])
cc: [email protected]

4. PRE-PROPOSAL SITE VISITS

Before submitting a proposal, Contractors are encouraged to thoroughly examine the property and fully understand the conditions that in any way could affect their proposal.  Failure to do so, will in no way, relieve the Contractor from satisfactory performance under the proposal submitted.

A pre-proposal site visit is scheduled for Tuesday, February 10, 2026 at 9:00 A.M. meeting in the parking lot closest to Old Navy.

5. QUALITY CONTROL & SUBCONTRACTING

Work performed under this proposal shall be performed in accordance with a contract between you and Owner.  If the contract allows, subject to approval in writing by Owner’s Representative, you may subcontract any work to be performed under this contract.  However, your election to subcontract any work does not relieve you from any responsibility or liability under this contract. Work must be successfully completed in accordance with all applicable state and federal regulations and laws.

6. INSURANCE REQUIREMENTS

Contractor and all subcontractors shall procure and maintain the following types and limits of insurance for the duration of this project:

Type of Insurance: Limits of Liability

Worker’s Compensation: Statutory

Employer’s Liability: $1,000,000

Commercial General Liability – Personal Injury/Property Damage: $1,000,000 combined single limit per occurrence; $2,000,000 aggregate

Automobile Liability – Bodily Injury And Property Damage: $1,000,000 combined single limit per occurrence
-Hired car, owned and non-owned autos

Owner will be an additional insured on Contractor’s commercial general liability and automobile liability policies, including a waiver of subrogation on both policies in favor of GLP.

A signed Certificate or Certificates of Insurance will be furnished to Owner before work is performed or furnished by Contractor.  Contractor will provide notice to Owner in accordance with the insurance policy of any change, modification, cancellation or termination of any insurance policy described in this RFP.

7. PROPOSALS

7.1 Proposals are due prior to 11:59 P.M. on Monday, March 2, 2026.

PROPOSALS must be submitted online in the form below.

Bid Detail/Proposal must be priced according to this schedule of values:

A. Mill & Overlay
Item Description Quantity* Unit Unit Price AMOUNT
1 Mobilization 1 LS
2 Traffic Control and Site Prep 1 LS
3 Concrete Curb Repairs 40 LF
4 Mill and Pave ¾” B HMA 52,228 SF
5 Pavement Markings 1 LS
Subtotal of Section A

 

B. Striping Other Lots
Item Description Quantity* Unit Unit Price AMOUNT
6 Pavement Markings 1 LS
Subtotal of Section B

 

C. Other Costs
Item Description Unit Unit Price
7 Night work cost – if additional fee LS
8 Other (any other fees): including costs of all equipment, fuels, materials, insurances, fees and transportation costs associated with all aspects of the work. LS
Subtotal of Section C
Project Total (Sections A + B + C)

* All quantities are estimated. Contractor shall be solely responsible to verify all quantities prior to bidding to incorporate into their pricing. For pricing, Contractor shall use the quantities listed in this Schedule of Values to calculate their unit price.

7.2 REQUIRED DOCUMENTS (current contractors only need to submit the proposal, a list of subcontractors, and construction schedules)

    • Proposal  (broken out in line items the same as the schedule of values above)
    • List of any/all Subcontractors
    • Construction Schedule
    • Statement of qualification
    • Business License
    • Sample invoice
    • References – three to five independent references required
    • Certificate of insurance evidencing current coverage as noted in this RFP

All contractors submitting a proposal may be subject to a background check.

8. CONTRACTOR QUALIFICATIONS

8.1 Contractor certifies that they have completed within the past three (3) years a minimum of three (3) projects of similar nature and scope of work.

8.2 Contractor maintains a permanent place of business with a minimum of five (5) years in the business.

9. OWNER RESERVATIONS

9.1 Owner reserves the right to reject any or all proposals, to waive or not waive informalities or irregularities in proposals or proposal procedures, and to accept or further negotiate cost, terms, or conditions of any proposal determined by Owner to be in the best interests of Owner even though not the lowest bid.

9.2 Owner reserves the right to negotiate any and all elements of any proposal.



Online Proposal Submission Form

Please select the option that best describes you:
Address(Required)
Contact Name(Required)

Bid Detail Costs

1 LS
1 LS
~40 LS
~52,228 SF
1 LS
(If additional fee)
Include costs of all equipment, fuels, materials, insurances, fees and transportation costs associated with all aspects of the work.
Subtotal A + Subtotal B + Subtotal C

Required Documents

All costs (broken out in line items the same as the schedule of values above)
Drop files here or
Max. file size: 50 MB.
    Estimated Construction Schedule & List of Subcontractors
    Drop files here or
    Max. file size: 50 MB.
      Max. file size: 50 MB.
      Max. file size: 50 MB.
      Max. file size: 50 MB.
      3-5 independent references required
      Max. file size: 50 MB.
      Certificate of insurance evidencing current coverage as required by RFP
      Max. file size: 50 MB.
      This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.
      Downloadable Documents:
      RFP - NC2
      SOW - NC2
      Exhibit A - NC2
      • Visit The Washington Companies Website

      © 2026 The Washington Companies. All Rights Reserved.