MM & TRS Parking Lot Asphalt
Locations of Work (2):
General Office Building
101 International Drive, Missoula MT 59808
TRS Building
100 Western Way, Missoula MT 59808
Downloadable Documents: RFP - MM & TRS
SOW - MM-TRS
Exhibit A - MM-TRS
Washington Companies, LLC (“Owner” or “WC”) is requesting proposals for asphalt striping and seal coat for the Western Trade Center parking lots. Please read the Scope of Work for details .
Contractors (“Contractor”, “Company”, “your” or “you”) are hereby invited to submit a statement of qualification and a proposal to provide these services in accordance with this request for proposal (“RFP”).
1. RFP SCHEDULE
Issue Date | April 30, 2025 |
Pre-proposal Site Visit | schedule at will |
Proposal Submissions Due | May 20, 2025 |
Notification of Award | May 30, 2025 |
Proposals will not be evaluated unless all documents requested are submitted in a complete package. The information requested is the minimum required in order to qualify for consideration. Your statement of qualification should include company history, company principals, safety program and appropriate licenses. The selected contractor will be required to enter into an agreement based on the specifications outlined in this RFP.
The property is managed by Washington Corporations’ Facilities Department.
2. SCOPE OF WORK
See the scope of work (“SOW”) for details.
The SOW includes the following documents:
If there is a contradiction between this RFP and the SOW, this RFP controls.
3. PRE-PROPOSAL SITE VISITS
Before submitting a proposal, Contractors are encouraged to thoroughly examine the property and fully understand the conditions that in any way could affect their proposal. Failure to do so, will in no way, relieve the Contractor from satisfactory performance under the proposal submitted. A pre-proposal site visit is highly encouraged. To schedule a pre-proposal site visit, contact Brian Brush, Facilities Manager, [email protected] or 406-523-1211.
4. PRE-PROPOSAL QUESTIONS
Any questions concerning this RFP and all correspondence must be submitted in writing by contacting:
Brian Brush, [email protected]
cc: [email protected]
Questions will not be accepted by telephone. All questions must include contractors name, address and/or email address and be submitted 72 hours prior to proposal due date.
5. QUALITY CONTROL & SUBCONTRACTING
Work performed under this proposal shall be performed in accordance with a contract between you and Owner. If the contract allows, subject to approval in writing by Owner’s representative, you may subcontract any work to be performed under this contract. However, your election to subcontract any work does not relieve you from any responsibility or liability under this contract. Work must be successfully completed in accordance with all applicable state and federal regulations and laws.
6. INSURANCE REQUIREMENTS
Contractor and all subcontractors shall procure and maintain the following types and limits of insurance for the duration of this Agreement:
Type of Insurance:
Limits of Liability
Worker’s Compensation:
Statutory
Employer’s Liability:
$1,000,000
Commercial General Liability – Personal Injury/Property Damage:
$1,000,000 combined single limit per occurrence; $2,000,000 aggregate
Automobile Liability – Bodily Injury And Property Damage:
$1,000,000 combined single limit per occurrence
-Hired car, owned and non-owned autos
WC and Washington Corporations shall be an additional insured on Contractor’s commercial general liability and automobile liability policies, including a waiver of subrogation on both policies in favor of WC and Washington Corporations.
A signed Certificate or Certificates of Insurance shall be furnished to Owner before any Services are performed or furnished by Contractor. Contractor shall provide notice to Owner in accordance with the insurance policy of any change, modification, cancellation or termination of any insurance policy described in this Agreement.
Contractor shall proactively provide Owner with updated insurance certificates on an annual basis.
7. PROPOSALS
7.1 Proposals are due by 11:59 P.M. Tuesday, May 20, 2025
PROPOSALS must be submitted in the form below .
7.2 Required Documents (current contractors only need to submit the proposal)
-
-
- Proposal (All costs including but not limited to taxes and insurance)
- Statement of qualification
- Business License
- Sample invoice
- References – three to five independent references required
- Certificate of insurance evidencing current coverage as noted in this RFP
-
All contractors submitting a proposal will be subject to a background check. Work must be successfully completed in accordance with all applicable state and federal regulations and laws.
8. CONTRACTOR QUALIFICATIONS
8.1 Contractor certifies that is has completed within the past three (3) years a minimum of three (3) projects of similar nature and scope of work.
8.2 Contractor maintains a permanent place of business with a minimum of five (5) years in the business.
9. OWNER RESERVATIONS
9.1 Owner reserves the right to reject any or all proposals, to waive or not waive informalities or irregularities in proposals or proposal procedures, and to accept or further negotiate cost, terms, or conditions of any proposal determined by Owner to be in the best interests of Owner even though not the lowest bid.
9.2 Owner reserves the right to negotiate any and all elements of any proposal.
**End of RFP**
Scopes of Work & Exhibits
Online Proposal Submission Form
This form has closed.