Washington Companies Maintenance

Maintenance Contracts: Invitation to Bid

  • Open RFP Categories
    • 2026 GLP – 3 HVAC Units
    • 2026 GOB – 4 HVAC Units
    • 2026 GOB – Parking Lot Demo and Repave + Sidewalk Project
    • 2026 North Centre II – Asphalt Maintenance Project
    • 2026 NP Depot – Asphalt Maintenance Project
  • Expectations
  • Contact Us

2026 GOB – Parking Lot Demo and Repave + Sidewalk Project

PROPOSAL DUE DATE March 31, 2026
AWARD DATE: April 28, 2026
CONTRACT PERIOD: May 1, 2026 - October 30, 2026

GOB Parking Lot Demo and Repave + Sidewalk Project

Locations of Work (1):
General Office Building
101 International Drive, Missoula MT 59808

Downloadable Documents:
RFP - GOB Lot + Sidewalk
SOW - GOB Lot + Sidewalk
Exhibit A - The Plans
Exhibit B - SWPPP Drawings

Washington Companies, LLC (“Owner” or “WC“) is requesting proposals for the total reconstruction of half of its headquarters’ front parking lot. This project will include: 1) the complete removal of pavement, sub-base preparation, and repaving/striping the parking lot, and 2) additional sidewalk improvements.

Contractors (“Contractor”, “Company”, “your” or “you”) are hereby invited to submit a statement of qualification and a proposal to provide these services in accordance with this request for proposal (“RFP“).

NOTE: Owner is asking for a proposal with 2 potential phases:

      1. Total demo and repave of front half of parking lot, and
      2. Modern Machinery sidewalk and loading zone pullout replacement in the City of Missoula right of way.

The hope is to complete all phases in 2026, but due to budget constraints, permitting, and market variability, it may not be possible. Owner will make the decision within 30 days of the proposal submission date.

1. RFP SCHEDULE

Issue Date February 20, 2026
Pre-proposal Site Visit March 11, 2026
Proposal Submissions Due March 31, 2026 at Midnight
Notification of Award April 28, 2026

Proposals will not be evaluated unless all documents requested are submitted in a complete package. The information requested is the minimum required in order to qualify for consideration.  Your statement of qualification should include company history, company principals, safety program and appropriate licenses. The selected contractor will be required to enter into an agreement based on the specifications outlined in this RFP.

The property is managed by Washington Corporations’ Facilities Department.

2. SCOPE OF WORK

2.1  See the scope of work (“SOW”) for details.

The SOW includes the following documents:

        1. SOW (4 pages)
        2. Exhibit A – The Plans (11 pages)
        3. Exhibit B – SWPPP Drawings (4 pages)

2.2  Any modifications to the SOW shall require a formal change order which must be mutually agreed upon in writing and executed by both parties.

3. PRE-PROPOSAL SITE VISITS

Before submitting a proposal, Contractors are encouraged to thoroughly examine the property and fully understand the conditions that in any way could affect their proposal.  Failure to do so, will in no way, relieve the Contractor from satisfactory performance under the proposal submitted.

A pre-proposal site visit is scheduled for Wednesday, March 11, 2026 at 9:00 A.M. meeting in the front parking lot by the main entrance.

4. CONTACTS

Questions will not be accepted by telephone.  All questions must include contractors name, address and/or email address and be submitted 72 hours prior to proposal due date.

Any questions concerning this RFP and all correspondence must be submitted in writing by contacting:

Brian Brush ([email protected])
cc: [email protected]

5. QUALITY CONTROL & SUBCONTRACTING

Work performed under this proposal shall be performed in accordance with a contract between you and Owner.  If the contract allows, subject to approval in writing by Owner’s Representative, you may subcontract any work to be performed under this contract.  However, your election to subcontract any work does not relieve you from any responsibility or liability under this contract. Work must be successfully completed in accordance with all applicable state and federal regulations and laws.

6. INSURANCE REQUIREMENTS

Contractor and all subcontractors shall procure and maintain the following types and limits of insurance for the duration of this project:

Type of Insurance: Limits of Liability

Worker’s Compensation: Statutory

Employer’s Liability: $1,000,000

Commercial General Liability – Personal Injury/Property Damage: $1,000,000 combined single limit per occurrence; $2,000,000 aggregate

Automobile Liability – Bodily Injury And Property Damage: $1,000,000 combined single limit per occurrence
-Hired car, owned and non-owned autos

Owner will be an additional insured on Contractor’s commercial general liability and automobile liability policies, including a waiver of subrogation on both policies in favor of WC.

A signed Certificate or Certificates of Insurance will be furnished to Owner before work is performed or furnished by Contractor.  Contractor will provide notice to Owner in accordance with the insurance policy of any change, modification, cancellation or termination of any insurance policy described in this RFP.

7. PROPOSALS

7.1 Proposals are due prior to 11:59 P.M. on Tuesday, March 31, 2026.

PROPOSALS must be submitted online in the form below.

7.2 REQUIRED DOCUMENTS (current contractors only need to submit the proposal, a list of subcontractors, and construction schedules)

    • Proposal  (broken out in line items the same as the schedule of values in the pdf RFP or in the form below)
    • List of any/all Subcontractors
    • Construction Schedule
    • Statement of qualification
    • Business License
    • Sample invoice
    • References – three to five independent references required
    • Certificate of insurance evidencing current coverage as noted in this RFP

All contractors submitting a proposal may be subject to a background check.

8. CONTRACTOR QUALIFICATIONS

8.1 Contractor certifies that they have completed within the past three (3) years a minimum of three (3) projects of similar nature and scope of work.

8.2 Contractor maintains a permanent place of business with a minimum of five (5) years in the business.

9. OWNER RESERVATIONS

9.1 Owner reserves the right to reject any or all proposals, to waive or not waive informalities or irregularities in proposals or proposal procedures, and to accept or further negotiate cost, terms, or conditions of any proposal determined by Owner to be in the best interests of Owner even though not the lowest bid.

9.2 Owner reserves the right to negotiate any and all elements of any proposal.



Online Proposal Submission Form

Please select the option that best describes you:(Required)
Address(Required)
Contact Name(Required)

7.1 Bid Detail Costs

[Amount] fields auto-calculate based on the unit price and # of LS=Lump Sum|SF= Square Feet|LF=Linear Feet
1 LS
Total Project Amount
1 LS
Total Project Amount
1 LS
Total Project Amount
~42 LF
Total Project Amount
~45,514 SF
Total Project Amount
1 LS
Total Project Amount
1 SF
1 LS
Total Project Amount
220 LS
Total Project Amount
~1,491 SF
Total Project Amount
~679 SF
Project Total Amount
~125 LF
Total Project Amount
1 SF
Sections A + B + C

7.2 Required Documents

(Current contractors only need to submit the proposal, a list of subcontractors, & construction schedule)
Proposal, Construction Schedule, & List of Subcontractors
Drop files here or
Max. file size: 50 MB.
    Max. file size: 50 MB.
    Max. file size: 50 MB.
    Max. file size: 50 MB.
    3-5 independent references required
    Max. file size: 50 MB.
    Certificate of insurance evidencing current coverage as required by RFP
    Max. file size: 50 MB.
    This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.
    Downloadable Documents:
    RFP - GOB Lot + Sidewalk
    SOW - GOB Lot + Sidewalk
    Exhibit A - The Plans
    Exhibit B - SWPPP Drawings
    • Visit The Washington Companies Website

    © 2026 The Washington Companies. All Rights Reserved.